ILS procedure for runway 27R at Bengaluru (VOBL) temporarily withdrawn due to equipment replacement.
2025-05-02 09:48 - 2025-07-29 23:59
Period of Applicability
2025-05-02 09:48 - 2025-07-29 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The ILS procedure for runway 27R at Bengaluru (VOBL) has been temporarily withdrawn due to equipment replacement, as referenced in the EAIP page AD 2 VOBL 2-107 dated 08 September 2022.
Message
REF EAIP PAGE AD 2 VOBL 2-107 DATED 08 SEP 2022 REGARDING ILS RWY 27R PROC OF BENGALURU (VOBL) AP. ILS RWY 27R PROC WITHDRAWN TEMPO DUE EQPT REPLACEMENT.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-02 09:50
Was this helpful?