G0517/25
Checking status...
Instrument Landing Systems

ILS procedure for runway 27R at Bengaluru (VOBL) temporarily withdrawn due to equipment replacement.

2025-05-02 09:48 - 2025-07-29 23:59

Period of Applicability

2025-05-02 09:48 - 2025-07-29 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS procedure for runway 27R at Bengaluru (VOBL) has been temporarily withdrawn due to equipment replacement, as referenced in the EAIP page AD 2 VOBL 2-107 dated 08 September 2022.

Message

REF EAIP PAGE AD 2 VOBL 2-107 DATED 08 SEP 2022 REGARDING ILS RWY 27R PROC OF BENGALURU (VOBL) AP. ILS RWY 27R PROC WITHDRAWN TEMPO DUE EQPT REPLACEMENT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0517/25 NOTAMR G0124/25
Q) VOMF/QPIAW/I/NBO/A/000/999/1312N07742E005
A) VOBL B) 2505020948 C) 2507292359 EST
E) REF EAIP PAGE AD 2 VOBL 2-107 DATED 08 SEP 2022 REGARDING ILS RWY
27R PROC OF BENGALURU (VOBL) AP. ILS RWY 27R PROC WITHDRAWN TEMPO
DUE EQPT REPLACEMENT.
Issued at: 2025-05-02 09:50
Was this helpful?