A0783/25
Checking status...
Taxiway Operations

Portion of taxiway B and portion of taxiway P not available.

2025-03-13 07:30 - 2025-06-12 09:30

Period of Applicability

2025-03-13 07:30 - 2025-06-12 09:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A portion of taxiway B between taxiway P and taxiway B2 and a portion of taxiway P between taxiway A1 and P1 are not available every Thursday from 07:30 to 09:30.

Message

PORTION OF TWY B BTN TWY P AND TWY B2 AND PORTION OF TWY P BTN TWY A1 AND P1 NOT AVBL

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0783/25 NOTAMN
Q) VOMF/QMXLC/IV/BO/A/000/999/1312N07742E005
A) VOBL B) 2503130730 C) 2506120930
D) EV THU 0730-0930
E) PORTION OF TWY B BTN TWY P AND TWY B2 AND PORTION OF TWY P BTN TWY
A1 AND P1 NOT AVBL
Issued at: 2025-03-10 15:08
Was this helpful?