A3399/24
Checking status...
Flight Procedures

Deletion of specific points in low visibility procedure at VOBL.

2024-11-08 13:00 - PERM

Period of Applicability

2024-11-08 13:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Points 2.1.4, 2.1.5, 2.1.6, 2.1.7, 2.1.8, 2.2.2, 6.5(E), 6.5(F), 6.5(G), 7.3(D), and 7.3(E) have been deleted from the low visibility procedure as outlined in the airport documentation for VOBL.

Message

REF EAIP AD2 VOBL. DELETE POINTS 2.1.4, 2.1.5, 2.1.6, 2.1.7, 2.1.8, 2.2.2, 6.5(E), 6.5(F) , 6.5(G) , 7.3(D) , 7.3(E) OF PARA II OF LOW VIS PROC OF AD2.22 FLT PROC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3399/24 NOTAMN
Q) VOMF/QFAXX/IV/BO/A/000/999/
A) VOBL B) 2411081300 C) PERM
E) REF EAIP AD2 VOBL. DELETE POINTS 2.1.4, 2.1.5, 2.1.6, 2.1.7,
2.1.8, 2.2.2, 6.5(E), 6.5(F) , 6.5(G) , 7.3(D) , 7.3(E) OF PARA II OF 
LOW VIS PROC OF AD2.22 FLT PROC.
Issued at: 2024-11-08 12:49
Was this helpful?