Change in arrival procedures for aircraft at Bengaluru airport.
2025-01-27 04:30 - PERM
Period of Applicability
2025-01-27 04:30 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
All arriving aircraft must contact different Bengaluru Ground frequencies based on the vacated runway. North Runway (09L/27R): 121.650 MHz. South Runway (09R/27L): 121.775 MHz. The e-AIP is to be updated accordingly.
Message
REFER E-AIP INDIA,VOBL AD 2.22 PART III PARA 5.2.2 ARRIVAL PROCEDURE INSERT THE FOLLOWING: 1.ALL ARRIVING AIRCRAFT AFTER VACATING THE NORTH RUNWAY (09L/27R),TO CONTACT BENGALURU GROUND ON 121.650 ...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-01-17 11:02
Was this helpful?