A0524/25
Checking status...
Runway Operations

Earthwork in progress on the north side of runway 09L/27R for ground position indicator replacement; caution advised.

2025-02-17 11:45 - 2025-04-30 23:59

Period of Applicability

2025-02-17 11:45 - 2025-04-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Earthwork is underway on the north side of runway 09L/27R for the replacement of the ground position indicator, located between 90 and 140 meters from the runway centerline. All pilots are advised to exercise caution in this area.

Message

EARTH WORK WI RWY STRIP ON NORTH SIDE OF RWY09L/27R FOR REPLACEMENT OF GP IN PROGRESS AT A DIST OF 90M TO 140M FM RCL. ALL PILOTS TO EXER CTN.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0524/25 NOTAMR A3354/24
Q) VOMF/QMWHW/IV/BO/A/000/999/
A) VOBL B) 2502171145 C) 2504302359
E) EARTH WORK WI RWY STRIP ON NORTH SIDE OF RWY09L/27R FOR
REPLACEMENT OF GP IN PROGRESS AT A DIST OF 90M TO 140M FM RCL.
ALL PILOTS TO EXER CTN.
Issued at: 2025-02-17 11:49
Was this helpful?