A3105/25
Checking status...
Runway Operations

Main runway 09R/27L closed, with operations on runway 09L/27R limited to up to Code E aircraft.

2025-10-14 06:30 - 2026-01-07 10:00

Period of Applicability

2025-10-14 06:30 - 2026-01-07 10:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Main runway 09R/27L is closed for operations every Tuesday from 0630 to 1000; during this time runway 09L/27R is available for operations up to Code E aircraft. Maximum restoration time is 30 minutes. Aircraft are likely to be delayed.

Message

MAIN RWY 09R/27L NOT AVBL FOR OPS. DRG THIS TIME SRY RWY 09L/27R AVBL FOR OPS UPTO CODE E ACFT. MAX RESTORATION TIME 30 MIN. ACFT LIKELY TO BE DLA.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) VOMF/QMRLC/IV/BO/A/000/999/1714N07826E005
A) VOHS B) 2510140630 C) 2601071000
D) EV TUE 0630-1000
E) MAIN RWY 09R/27L NOT AVBL FOR OPS.
DRG THIS TIME SRY RWY 09L/27R AVBL FOR OPS UPTO CODE E ACFT.
MAX RESTORATION TIME 30 MIN. ACFT LIKELY TO BE DLA.
Issued 18 days ago
Was this helpful?