A2350/25
Checking status...
Other

ACDM is in place at VOHS aerodrome requiring aircraft operators to update TOBT and adhere to TSAT.

2025-07-31 00:00 - 2025-10-31 23:59

Period of Applicability

2025-07-31 00:00 - 2025-10-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Collaborative Decision Making (ACDM) is implemented at VOHS aerodrome. Aircraft operators are required to update their Target Off Block Time (TOBT) and adhere to the Target Start Up Approval Time (TSAT) during the specified schedule.

Message

REF EAIP INDIA VOHS AD 2.20 LOCAL AD REGULATIONS PARA 5. AP COLLABORATIVE DECISION MAKING(ACDM) WILL BE IN PLACE. ACFT OPR TO UPDATE TARGET OFF BLOCK TIME(TOBT) AND ADHERE TO TARGET START UP APPROVAL TIME(TSAT

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) VOMF/QFAXX/IV/BO/A/000/999/1714N07826E005
A) VOHS B) 2507310000 C) 2510312359
D) 0000-1730 2330-2359
E) REF EAIP INDIA VOHS AD 2.20 LOCAL AD REGULATIONS 
PARA 5. AP COLLABORATIVE DECISION MAKING(ACDM) WILL
BE IN PLACE. ACFT OPR TO UPDATE TARGET OFF BLOCK TIME(TOBT)
AND ADHERE TO TARGET START UP APPROVAL TIME(TSAT
Issued 21 days ago
Was this helpful?