A1706/26
Checking status...
OBSConstruction Activity

Work in progress north of runway 09L/27R between taxiway B1 and B2.

2026-05-22 09:30 - 2026-06-25 12:30
Duration:2 months

Period of Applicability

2026-05-22 09:30 - 2026-06-25 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress is ongoing 110 m north of the runway 09L/27R centre line between taxiway B1 and taxiway B2. Maximum equipment height is 2.5 m. Pilots to exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1706/26 NOTAMR A1437/26
Q) VOMF/QMRXX/IV/BO/A/000/999/1714N07826E005
A) VOHS B) 2605220930 C) 2606251230
E) WIP AT DIST OF 110M NORTH OF RWY 09L/27R CL BTN TWY B1
AND TWY B2.MAX EQPT HGT WILL BE 2.5M.PILOTS TO EXER CTN.
Was this helpful?