A1122/26
Checking status...
ADRunway Operations

RWY 09L downgraded to non-precision due to WIP in the basic strip.

2026-03-30 11:15 - 2026-06-30 12:30
Duration:LONG4 months

Period of Applicability

2026-03-30 11:15 - 2026-06-30 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 09L is downgraded to non-precision due to work in progress along the drain in the basic strip.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1122/26 NOTAMR A4113/25
Q) VOMF/QMRXX/IV/BO/A/000/999/1714N07826E005
A) VOHS B) 2603301115 C) 2606301230
E) RWY09L IS NON PRECISION DUE WIP
ALONG THE DRAIN IN BASIC STRIP.
Was this helpful?