Trial operations of simultaneous operations on diverging runways 25 and 30 will take place.
2025-06-24 12:25 - 2025-09-24 12:30
Period of Applicability
2025-06-24 12:25 - 2025-09-24 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Trial operations of simultaneous operations on diverging runways 25 and 30 will take place, involving arrival and departure operations on runway 25 and departure operations on runway 30, with specific line-up instructions at taxiway R3 intersection.
Message
TRIAL OPS OF SIMUL OPS ON DIVERGING RWY25 AND RWY30 WILL TAKE PLACE WITH THE FLW DETAILS: 1. ARR AND DEP OPS ON RWY25 AND DEP OPS ON RWY30 2. DEP FM RWY30 TO LINE UP AT TWY R3 INT (TORA 2509M) 3. DRG ...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 2 months ago
Was this helpful?