A1943/25
Checking status...
Runway Operations

Trial operations of simultaneous operations on diverging runways 25 and 30 will take place.

2025-06-24 12:25 - 2025-09-24 12:30

Period of Applicability

2025-06-24 12:25 - 2025-09-24 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Trial operations of simultaneous operations on diverging runways 25 and 30 will take place, involving arrival and departure operations on runway 25 and departure operations on runway 30, with specific line-up instructions at taxiway R3 intersection.

Message

TRIAL OPS OF SIMUL OPS ON DIVERGING RWY25 AND RWY30 WILL TAKE PLACE WITH THE FLW DETAILS: 1. ARR AND DEP OPS ON RWY25 AND DEP OPS ON RWY30 2. DEP FM RWY30 TO LINE UP AT TWY R3 INT (TORA 2509M) 3. DRG ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1943/25 NOTAMR A0919/25
Q) VOMF/QFAXX/IV/BO/A/000/999/
A) VOMM B) 2506241225 C) 2509241230 EST
E) TRIAL OPS OF SIMUL OPS ON DIVERGING RWY25 AND
RWY30 WILL TAKE PLACE WITH THE FLW DETAILS:
1. ARR AND DEP OPS ON RWY25 AND DEP OPS ON RWY30
2. DEP FM RWY30 TO LINE UP AT TWY R3 INT (TORA 2509M)
3. DRG HR OF DAYLIGHT ON NEED BASIS INFO WILL BE
 BCST ON ATIS
4. NO SID WILL BE ISSUED PRIOR TO DEP
5. IN CASE OF MISSED APCH ARR ACFT ON RWY25 SHALL
 CMB STRAIGHT AHEAD 3000FT AND FURTHER CMB UNDER
 RADAR DRG SIMUL OPS ON RWY25 AND RWY30
Issued 2 months ago
Was this helpful?