A1452/26
Checking status...
ADTaxiway Operations

Taxiway N, taxiway Q and taxiway Q1 are closed for operations.

2026-04-30 09:30 - 2026-06-29 12:30
Duration:3 months

Period of Applicability

2026-04-30 09:30 - 2026-06-29 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is ongoing on the basic strip of runway 12/30 between taxiway P1 and taxiway R3, 110 m from the runway centreline. Remarks: portion of taxiway N between taxiway P1 and taxiway R3 is closed for operations, portion of taxiway Q between taxiway Q2 and taxiway N is closed for operations, and taxiway Q1 is closed for operations.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1452/26 NOTAMN
Q) VOMF/QMXLC/IV/BO/A/000/999/1300N08011E005
A) VOMM B) 2604300930 C) 2606291230
E) WIP ON THE BASIC STRIP OF RWY 12/30 BTN TWY P1 AND TWY R3  AT A
DISTANCE OF 110M AWAY FM THE RWY CL.
RMK:
1. PORTION OF TWY N BTN TWY P1 AND TWY R3 CLSD FOR OPS.
2. PORTION OF TWY Q BTN TWY Q2 AND TWY N CLSD FOR OPS.
3. TWY Q1 CLSD FOR OPS.