Work in progress for aircraft arresting gear near RWY 28; caution for personnel and machinery near the runway.

2026-04-23 05:50 - 2026-05-24 18:29
Duration:2 months

Period of Applicability

2026-04-23 05:50 - 2026-05-24 18:29

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Installation work in progress for aircraft arresting gear located 1400 ft from RWY 28 threshold (300 ft before the displaced threshold RWY 28). Pilots exercise caution for personnel, materials, and machinery up to 8 m high positioned 30 m from the runway centerline.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1381/26 NOTAMR A1264/26
Q) VOMF/QMRXX/IV/BO/A/000/999/1743N08313E005
A) VOVZ B) 2604230550 C) 2605241829
E) INSTALLATION WIP FOR ACFT ARRESTING GEAR
1400FT FM RWY28 THR (300FT BEFORE DISPLACED THR RWY28).
PILOT TO EXER CTN FOR PRESENCE OF MAN,MATERIAL AND
MACHINERY OF HGT 08M AT 30M FM RWY CL.