Work in progress on runway 05 with a 25 m high drain rig operating near the threshold; pilots should exercise caution.
2025-08-29 04:31 - 2025-09-30 07:59
Period of Applicability
2025-08-29 04:31 - 2025-09-30 07:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress: a pre-fabricated vertical drain rig 25 m high is operating in an area 90 m x 45 m starting from the threshold of runway 05; pilots are requested to exercise caution.
Message
CONST WIP FOR ORA 05.PILOTS TO EXER CTN FOR PRE FABRICATED VERTICAL DRAIN RIG OF HGT 25M OPR IN AREA OF DIMENSIONS 90MX45M STARTING FM THR RWY 05.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 6 days ago
Was this helpful?