Construction work in progress on runway 05 and taxiway PTT, affecting operations.
2025-04-17 03:30 - 2025-07-17 03:30
Period of Applicability
2025-04-17 03:30 - 2025-07-17 03:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Construction work in progress on runway 05 and taxiway PTT between S1 and S2. Runway 05/23 is not available for fixed-wing aircraft operations except for taxiing. Runway 05/23 between S3 and S4 is available for aircraft taxi and helicopter operations. Taxi links L1, L2, and newly constructed PTT portion between L1 are affected.
Message
ORA 05 AND PTT CONST WIP BTN S1 AND S2. RWY 05/23 NOT AVBL FOR F WING ACFT OPS EXC FOR TAX. RWY 05/23 BTN S3 AND S4 AVBL FOR ACFT TAX AND HELO OPS. TAX LINK L1, L2 AND NEWLY CONST PTT PORTION BTN L1 A...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-16 13:55
Was this helpful?