A1153/25
Checking status...
Runway Operations

Construction work in progress on runway 05 and taxiway PTT, affecting operations.

2025-04-17 03:30 - 2025-07-17 03:30

Period of Applicability

2025-04-17 03:30 - 2025-07-17 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Construction work in progress on runway 05 and taxiway PTT between S1 and S2. Runway 05/23 is not available for fixed-wing aircraft operations except for taxiing. Runway 05/23 between S3 and S4 is available for aircraft taxi and helicopter operations. Taxi links L1, L2, and newly constructed PTT portion between L1 are affected.

Message

ORA 05 AND PTT CONST WIP BTN S1 AND S2. RWY 05/23 NOT AVBL FOR F WING ACFT OPS EXC FOR TAX. RWY 05/23 BTN S3 AND S4 AVBL FOR ACFT TAX AND HELO OPS. TAX LINK L1, L2 AND NEWLY CONST PTT PORTION BTN L1 A...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1153/25 NOTAMN
Q) VOMF/QMRXX/IV/BO/A/000/999/1743N08313E005
A) VOVZ B) 2504170330 C) 2507170330
E) ORA 05 AND PTT CONST WIP BTN S1 AND S2.
RWY 05/23 NOT AVBL FOR F WING ACFT OPS EXC FOR TAX.
RWY 05/23 BTN S3 AND S4 AVBL FOR ACFT TAX AND HELO OPS.
TAX LINK L1, L2 AND NEWLY CONST PTT PORTION BTN L1 AND L2
AVBL FOR TAX AND HELO OPS.
Issued at: 2025-04-16 13:55
Was this helpful?