A1243/26
Checking status...
ADTaxiway Operations

Work in progress on both sides of TWY S1; pilots exercise caution.

2026-04-10 18:29 - 2026-06-30 00:30
Duration:aggregated 21 days

Period of Applicability

2026-04-10 18:29 - 2026-06-30 00:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work in progress on both sides of taxiway S1 in an area 110 m by 14 m by 2 m adjacent to the taxiway; pilots exercise caution. Schedule: 1829–0030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1243/26 NOTAMN
Q) VOMF/QMXHW/IV/BO/A/000/999/1743N08313E005
A) VOVZ B) 2604101829 C) 2606300030
D) 1829-0030
E) CONST WIP ON BOTH SIDES OF TWY S1 IN AREA OF
DIMENSIONS 110M X 14M X 2M ADJ TO TWY.
PILOTS TO EXER CTN
Was this helpful?