A0721/25
Checking status...
Airspace Changes

Activation of operational trials for simultaneous independent parallel operations at Suvarnabhumi Intl Airport.

2025-03-14 07:36 - 2025-06-11 23:59

Period of Applicability

2025-03-14 07:36 - 2025-06-11 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The NOTAM announces the activation of operational trials for simultaneous independent parallel operations, including simultaneous independent parallel approaches and departures at Suvarnabhumi International Airport. Relevant updates will be broadcast on the arrival and departure ATIS frequencies. Pilots must strictly comply with ATC instructions.

Message

ACTIVATION OF OPERATIONAL TRIALS FOR SIMULTANEOUS INDEPENDENT PARALLEL OPERATIONS, INCLUDING SIMULTANEOUS INDEPENDENT PARALLEL APPROACHES AND SIMULTANEOUS INDEPENDENT PARALLEL DEPARTURES AT ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0721/25 NOTAMR A0066/25
Q) VTBB/QPIXX/I/NBO/A/000/999/1341N10045E005
A) VTBS B) 2503140736 C) 2506112359
E) ACTIVATION OF OPERATIONAL TRIALS FOR SIMULTANEOUS INDEPENDENT
   PARALLEL OPERATIONS, INCLUDING SIMULTANEOUS INDEPENDENT PARALLEL
   APPROACHES AND SIMULTANEOUS INDEPENDENT PARALLEL DEPARTURES AT 
   SUVARNABHUMI INTL AIRPORT, WILL BE BROADCAST ON ARRIVAL ATIS
   (133.6 MHZ) AND DEPARTURE ATIS (127.65 MHZ). PILOTS MUST STRICTLY
   COMPLY WITH ATC INSTRUCTIONS.
Issued at: 2025-03-14 07:40
Was this helpful?