A0721/25
Checking status...
Flight Procedures

Activation of operational trials for simultaneous independent parallel operations including approaches and departures.

2025-03-14 07:36 - 2025-06-11 23:59

Period of Applicability

2025-03-14 07:36 - 2025-06-11 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Operational trials have been activated to test simultaneous independent parallel operations, which includes both approaches and departures.

Message

ACTIVATION OF OPERATIONAL TRIALS FOR SIMULTANEOUS INDEPENDENT PARALLEL OPERATIONS, INCLUDING SIMULTANEOUS INDEPENDENT PARALLEL APPROACHES AND SIMULTANEOUS INDEPENDENT PARALLEL DEPARTURES AT ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0721/25 NOTAMR A0066/25
Q) VTBB/QPIXX/I/NBO/A/000/999/1341N10045E005
A) VTBS B) 2503140736 C) 2506112359
E) ACTIVATION OF OPERATIONAL TRIALS FOR SIMULTANEOUS INDEPENDENT
   PARALLEL OPERATIONS, INCLUDING SIMULTANEOUS INDEPENDENT PARALLEL
   APPROACHES AND SIMULTANEOUS INDEPENDENT PARALLEL DEPARTURES AT 
   SUVARNABHUMI INTL AIRPORT, WILL BE BROADCAST ON ARRIVAL ATIS
   (133.6 MHZ) AND DEPARTURE ATIS (127.65 MHZ). PILOTS MUST STRICTLY
   COMPLY WITH ATC INSTRUCTIONS.
Issued at: 2025-03-14 07:40
Was this helpful?