A0485/25
Checking status...
Airspace Changes

Due to frng act, do not use specific PBN procedures for certain SIDs.

2025-03-24 22:00 - 2025-03-26 10:00

Period of Applicability

2025-03-24 22:00 - 2025-03-26 10:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Pilots are instructed not to use the PBN procedures for the following SIDs due to frng act: SID RNAV RWY 07: NAKHA 1A TRANSITION, SID RNAV RWY 25: NAKHA 1B TRANSITION, SID RNAV RWY 25: DOKLA 1A, SID RNAV RWY 07: GASSO 1A. This restriction is in effect on March 24 from 2200 to 2359, March 25 from 0000 to 0400, 0600 to 1000, and 2200 to 2359, and on March 26 from 0000 to 1000.

Message

DUE TO FRNG ACT, DO NOT USE THE PBN PROCEDURES AS FLW: - SID RNAV RWY 07: NAKHA 1A TRANSITION - SID RNAV RWY 25: NAKHA 1B TRANSITION - SID RNAV RWY 25: DOKLA 1A - SID RNAV RWY 07: GASSO 1A (SEE NOTAM ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0485/25 NOTAMN 
Q) VVHN/QPDLT/I/NBO/A/000/999/2049N10643E025
A) VVCI B) 2503242200 C) 2503261000 
D) 24 2200-2359
25 0000-0400 0600-1000 2200-2359
26 0000-1000
E) DUE TO FRNG ACT, DO NOT USE THE PBN PROCEDURES AS FLW:
- SID RNAV RWY 07: NAKHA 1A TRANSITION
- SID RNAV RWY 25: NAKHA 1B TRANSITION
- SID RNAV RWY 25: DOKLA 1A
- SID RNAV RWY 07: GASSO 1A
(SEE NOTAM VVVV A0476/25).
Issued at: 2025-03-23 02:54
Was this helpful?