A3222/25
Checking status...
Taxiway Operations

Painting work on Taxiway E occurs when there are no flight operations or intermittently between flights.

2025-09-30 10:31 - 2025-10-15 10:00

Period of Applicability

2025-09-30 10:31 - 2025-10-15 10:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Painting work on Taxiway E will take place when there are no flight operations or intermittently between flights. Areas affected include a portion from TWY E4 to TXL D11, and an area 70 m north of the centerline of TWY E7.

Message

PAINTING ON TWY E WHEN THERE ARE NO FLT OPS OR DRG INTERMITTENT TIME BTN FLTS, DETAILS AS FLW: - A PORTION FM TWY E4 TO TXL D11 - 70M FM CL OF TWY E7 TO THE NORTH

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3222/25 NOTAMN 
Q) VVHM/QMXXX/IV/BO/A/000/999/1603N10812E005
A) VVDN B) 2509301031 C) 2510151000 
E) PAINTING ON TWY E WHEN THERE ARE NO FLT OPS OR DRG 
INTERMITTENT TIME BTN FLTS, DETAILS AS FLW:
- A PORTION FM TWY E4 TO TXL D11
- 70M FM CL OF TWY E7 TO THE NORTH
Issued 11 days ago
Was this helpful?