A0428/25
Checking status...
Flight Procedures

Flight plan procedures adjusted for airlines at Noi Bai International Airport.

2025-03-14 11:57 - PERM

Period of Applicability

2025-03-14 11:57 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Airlines must ensure that Field 15 of the flight plan is fully filled, specifically the arrival procedure (STAR) must comply with the runway operation mode at Noi Bai International Airport.

Message

REF AIP VIET NAM PAGE AD 2-VVNB-1-106 ITEM 6.7.1 (B) DATED 28 NOV 2024 FLIGHT PLAN PROCEDURE OF AIRLINES WILL BE ADJUSTED AS FLW: THE AIRLINES MUST ENSURE THAT FIELD 15 OF THE FLIGHT PLAN IS FULLY F...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0428/25 NOTAMN 
Q) VVHN/QFAXX/IV/BO/A/000/999/2113N10548E005
A) VVNB B) 2503141157 C) PERM
E) REF AIP VIET NAM PAGE AD 2-VVNB-1-106 ITEM 6.7.1 (B) DATED 28 
NOV 2024
FLIGHT PLAN PROCEDURE OF AIRLINES WILL BE ADJUSTED AS FLW:
THE AIRLINES MUST ENSURE THAT FIELD 15 OF THE FLIGHT PLAN IS 
FULLY FILLED, ESPECIALLY THE ARR PROC (STAR) COMPLIED WITH RWY 
OPR MODE AT NOI BAI INTL AP.
Issued at: 2025-03-14 11:57
Was this helpful?