A1417/26
Checking status...
ADApron Operations

Intermittent work in progress on the apron from stands 14 to 29.

2026-05-18 17:00 - 2026-06-23 16:59
Duration:2 months

Period of Applicability

2026-05-18 17:00 - 2026-06-23 16:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on the apron from stands 14 to 29 will occur intermittently between flights. The working area will be stopped when there are VIP flight operations, visibility is less than 2000 m, or bad weather conditions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1417/26 NOTAMN
Q) VVHN/QMNHW/IV/BO/A/000/999/2113N10548E005
A) VVNB B) 2605181700 C) 2606231659
E) WIP ON APN (FM STANDS 14 TO 29) DRG INTERMITTENT TIME BTN
FLIGHTS
RMK: THE WORKING AREA WILL BE STOPPED WHEN THERE ARE VIP FLT
OPS, VIS LESS THAN 2000M OR BAD WX CONDITIONS.
Was this helpful?