A3879/25
Checking status...
Taxiway Operations

Taxiway repainting between TWY P3 and TWY P9 is in progress with work suspended during VIP operations or poor visibility/weather.

2025-10-20 18:00 - 2025-10-27 23:00

Period of Applicability

2025-10-20 18:00 - 2025-10-27 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway repainting is in progress between TWY P3 and TWY P9 in the area between the two holding positions leading to the runway, conducted intermittently between flights, daily from 1800 to 2300. Work will be suspended during VIP flight operations, when visibility is less than 2000 m, or in bad weather conditions.

Message

REPAINTING ON TAXIWAYS (FM TWY P3 TO TWY P9) IN THE AREA BETWEEN 2 THE HOLDING POSITIONS LEADING TO THE RWY DRG INTERMITTENT TIME BTN FLIGHTS. RMK: THE WORKING AREA WILL BE STOPPED WHEN THERE ARE VIP FLT OPS, VIS LESS THAN 2000M OR BAD WX CONDITION.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3879/25 NOTAMN 
Q) VVHN/QMXHW/IV/M/A/000/999/2113N10548E005
A) VVNB B) 2510201800 C) 2510272300 
D) DAILY 1800-2300
E) REPAINTING ON TAXIWAYS (FM TWY P3 TO TWY P9) IN THE AREA
BETWEEN 2 THE HOLDING POSITIONS LEADING TO THE RWY DRG INTERMITTENT 
TIME BTN FLIGHTS.
RMK: THE WORKING AREA WILL BE STOPPED WHEN THERE ARE VIP FLT 
OPS, VIS LESS THAN 2000M OR BAD WX CONDITION.
Issued 6 days ago
Was this helpful?