A0376/25
Checking status...
Construction Activity

Work in progress (WIP) in designated areas affecting flight operations.

2025-03-10 18:00 - 2025-03-24 23:00

Period of Applicability

2025-03-10 18:00 - 2025-03-24 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work is in progress on areas during intermittent times between flights, occurring daily from 18:00 to 23:00. Operations will be halted when there are VIP flights, visibility is less than 2000 meters, or in bad weather conditions.

Message

WIP ON AREAS DRG INTERMITTENT TIME BTN FLTS, DETAILS AS FLW: - AREA 1: + THE NORTHERN: ADJ TO NORTHERN SERVICE ROAD + THE SOUTHERN: 120M FM RCL 11R/29L + THE EASTERN: 295M FM THR OF RWY 11L - AREA 2:...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0376/25 NOTAMN 
Q) VVHN/QMAHW/IV/BO/A/000/999/2113N10548E005
A) VVNB B) 2503101800 C) 2503242300 
D) DAILY 1800-2300
E) WIP ON AREAS DRG INTERMITTENT TIME BTN FLTS, DETAILS AS FLW:
- AREA 1: 
+ THE NORTHERN: ADJ TO NORTHERN SERVICE ROAD
+ THE SOUTHERN: 120M FM RCL 11R/29L
+ THE EASTERN: 295M FM THR OF RWY 11L
- AREA 2: 
+ THE NORTHERN: ADJ TO WESTERN SERVICE ROAD
+ THE EASTERN: 300M FM THR OF RWY 11R 
RMK: THE WORKING AREA WILL BE STOPPED WHEN THERE ARE VIP FLT
OPS, VIS LESS THAN 2000M OR BAD WX CONDITION.
Issued at: 2025-03-07 05:33
Was this helpful?