A1971/26
Checking status...
ADApron Operations

Apron work in progress at stands 77 to 86 and 1H, 2H, 3H, and 9H.

2026-06-23 17:00 - 2026-07-24 16:59
Duration:2 months

Period of Applicability

2026-06-23 17:00 - 2026-07-24 16:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on apron from stands 77 to 86 and stands 1H, 2H, 3H, and 9H during intermittent time between flights. The working area will be stopped when there are VIP flight operations, visibility is less than 2000 m, or bad weather conditions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1971/26 NOTAMN
Q) VVHN/QMNHW/IV/BO/A/000/999/2113N10548E005
A) VVNB B) 2606231700 C) 2607241659
E) WIP ON APN (FM STANDS 77 TO 86, STANDS 1H, 2H, 3H, 9H) DRG
INTERMITTENT TIME BTN FLIGHTS
RMK: THE WORKING AREA WILL BE STOPPED WHEN THERE ARE VIP FLT
OPS, VIS LESS THAN 2000M OR BAD WX CONDITIONS.
Was this helpful?