Work in progress on areas adjacent to runway 10/28 and taxiways S, A1, A2, A3 during specified times.
2025-08-09 00:30 - 2025-10-01 10:00
Period of Applicability
2025-08-09 00:30 - 2025-10-01 10:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on areas adjacent to runway 10/28 and taxiways S, A1, A2, A3 during specified times when there are no flight operations. Work is scheduled daily from 0030 to 0430 and 0600 to 1000, except on September 2.
Message
WIP ON AREAS WHEN THERE ARE NO FLT OPS OR DRG INTERMITTENT TIME BTN FLTS, DETAILS AS FLW: - AREA 1: ALONG BOTH SIDES RWY 10/28 (LESS THAN 90M FM RCL) - AREA 2: ALONG BOTH SIDES TWYS S, A1, A2, A3 (43.5M FM CL OF TWYS S, A1, A2, A3.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued about 1 month ago
Was this helpful?