A0675/26
Checking status...
ADAirport Operations

Work in progress along both sides of RWY 10/28 and TWY S1/S2/S4/S5/S6/S8/S9/A1/A2/A3 when no flight operations or between flights.

2026-03-21 16:00 - 2026-05-18 22:00
Duration:aggregated 15 days

Period of Applicability

2026-03-21 16:00 - 2026-05-18 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress will occur on movement areas only when there are no flight operations or during intermittent gaps between flights, daily 1600-2200. Areas affected: along both sides of RWY 10/28 within 90 m of runway centerline, and along both sides of TWY S1, S2, S4, S5, S6, S8, S9, A1, A2, A3 within 43.5 m of the taxiway centerlines.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0675/26 NOTAMN
Q) VVHM/QMAHW/IV/BO/A/000/999/1010N10400E005
A) VVPQ B) 2603211600 C) 2605182200
D) DAILY 1600-2200
E) WIP ON AREAS WHEN THERE ARE NO FLT OPS OR DRG INTERMITTENT TIME
BTN FLIGHTS, DETAILS AS FLW:
- AREA 1: ALONG BOTH SIDES RWY 10/28 (LESS THAN 90M FM RCL)
- AREA 2: ALONG BOTH SIDES TAXIWAYS S1, S2, S4, S5, S6, S8,
S9, A1, A2, A3 (LESS THAN 43.5M FM CL OF TAXIWAYS S1, S2, S4,
S5, S6, S8, S9, A1, A2, A3).