Work in progress on areas adjacent to runway strip 10/28 and taxiway S during specified times.
2025-08-08 16:00 - 2025-09-30 22:00
Period of Applicability
2025-08-08 16:00 - 2025-09-30 22:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on areas adjacent to runway strip 10/28 and taxiway S during specified times when there are no flight operations. Work is scheduled daily from 1600 to 2200, except on September 1.
Message
WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAILS AS FLW: - AREA 1: RWY STRIP 10/28 - AREA 2: 141M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE NORTH - AREA 3: 231M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE SOUTH.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued about 1 month ago
Was this helpful?