A2589/25
Checking status...
Runway Operations

Work in progress on areas adjacent to runway strip 10/28 and taxiway S during specified times.

2025-08-08 16:00 - 2025-09-30 22:00

Period of Applicability

2025-08-08 16:00 - 2025-09-30 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress on areas adjacent to runway strip 10/28 and taxiway S during specified times when there are no flight operations. Work is scheduled daily from 1600 to 2200, except on September 1.

Message

WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAILS AS FLW: - AREA 1: RWY STRIP 10/28 - AREA 2: 141M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE NORTH - AREA 3: 231M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE SOUTH.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2589/25 NOTAMN 
Q) VVHM/QMAHW/IV/NBO/A/000/999/1010N10400E005
A) VVPQ B) 2508081600 C) 2509302200 
D) DAILY 1600-2200 EXC SEP 01
E) WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAILS AS FLW:
- AREA 1: RWY STRIP 10/28
- AREA 2: 141M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO 
THE NORTH
- AREA 3: 231M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE 
SOUTH.
Issued about 1 month ago
Was this helpful?