A2138/25
Checking status...
Runway Operations

WIP in areas when there are no flight operations with specific distance restrictions.

2025-07-04 16:00 - 2025-09-30 22:00

Period of Applicability

2025-07-04 16:00 - 2025-09-30 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress (WIP) is taking place in three areas when there are no flight operations, with specific distances from the runway centerline (RCL) and taxiway centerline (CL). The work is scheduled daily from 1600 to 2200.

Message

WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAILS AS FLW: - AREA 1: RWY STRIP 10/28 - AREA 2: 141M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE NORTH - AREA 3: 231M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE SOUTH.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2138/25 NOTAMN 
Q) VVHM/QMAHW/IV/BO/A/000/999/1010N10400E005
A) VVPQ B) 2507041600 C) 2509302200 
D) DAILY 1600-2200
E) WIP ON AREAS WHEN THERE ARE NO FLT OPS, DETAILS AS FLW:
- AREA 1: RWY STRIP 10/28
- AREA 2: 141M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO 
THE NORTH
- AREA 3: 231M FM RCL TO THE SOUTH AND 41M FM CL OF TWY S TO THE 
SOUTH.
Issued 14 days ago
Was this helpful?