A2585/25
Checking status...
Runway Operations

Work in progress on areas adjacent to the runway centerline during specified times.

2025-08-09 00:30 - 2025-10-01 10:00

Period of Applicability

2025-08-09 00:30 - 2025-10-01 10:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress on areas adjacent to the runway centerline during specified times. Work is scheduled daily from 0030 to 0430 and 0600 to 1000, except on September 2.

Message

WIP ON AREAS, DETAILS AS FLW: - AREA 1: 90M FM RCL TO THE NORTH - AREA 2: 90M FM RCL TO THE SOUTH AND 43.5M FM CL OF TWY S TO THE NORTH.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2585/25 NOTAMN 
Q) VVHM/QMAHW/IV/NBO/A/000/999/1010N10400E005
A) VVPQ B) 2508090030 C) 2510011000 
D) DAILY 0030-0430 0600-1000 EXC SEP 02
E) WIP ON AREAS, DETAILS AS FLW:
- AREA 1: 90M FM RCL TO THE NORTH
- AREA 2: 90M FM RCL TO THE SOUTH AND 43.5M FM CL OF 
TWY S TO THE NORTH.
Issued about 1 month ago
Was this helpful?