D1118/25
Checking status...
Publication Updates

AIP amendment will update WBGB apron surface and strength, aerodrome altimeter elevation and charts.

2025-09-04 00:00 - 2025-09-17 23:59

Period of Applicability

2025-09-04 00:00 - 2025-09-17 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Trigger NOTAM advising a permanent AIRAC AIP amendment (03/25) effective 04 Sep 2025 for WBGB that updates apron surface and strength data, aerodrome altimeter elevation and associated charts.

Message

TRIGGER NOTAM - PERM AIRAC AIP AMDT 03/25 WEF 04 SEP 2025, WBGB - UPDATING APRON SURFACE AND STRENGTH, ALTIMETER ELEVATION AND CHARTS.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) WBFC/QXXTT/IV/BO /A /000/999/0307N11301E005
A) WBGB B) 2509040000 C) 2509172359 
E) TRIGGER NOTAM - PERM AIRAC AIP AMDT 03/25 WEF 04 SEP 2025,
WBGB - UPDATING APRON SURFACE AND STRENGTH, ALTIMETER
ELEVATION AND CHARTS.
Issued about 1 month ago
Was this helpful?