A4020/25
Checking status...
UAS/Drone Operations

Unmanned aircraft will operate along the PETRONAS gas pipeline in the specified segment.

2025-09-02 23:00 - 2025-10-31 11:00

Period of Applicability

2025-09-02 23:00 - 2025-10-31 11:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Unmanned aircraft activity will take place along the PETRONAS gas pipeline between 055005N1003005E, 055000N1003108E and 054951N1003139E. Activity is subject to air traffic control and is scheduled daily 2300-1100.

Message

UA ACT WILL TAKE PLACE ALONG THE PETRONAS GAS PIPELINE FM: 055005N1003005E 055000N1003108E 054951N1003139E (NPS 12 GURUN LATERAL) RMK: 1. ACT SUBJ ATC

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) WMFC/QWULW/IV/BO /AW/000/004/0549N10030E001
A) WMKB B) 2509022300 C) 2510311100 
D) 2300-1100
E) UA ACT WILL TAKE PLACE ALONG THE PETRONAS GAS PIPELINE FM:

055005N1003005E 055000N1003108E 054951N1003139E 
(NPS 12 GURUN LATERAL)

RMK: 1. ACT SUBJ ATC 


F) SFC                             G) 400FT AGL
Issued about 1 month ago
Was this helpful?