Period of Applicability
2026-06-01 09:00 - 2026-06-30 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Daily construction works on the parallel taxiway on the left side of RWY 26, along the runway strip, with heavy equipment. Construction activity outside the runway strip is scheduled from 2300Z to 0800Z, and pilots are advised to observe before taxi, take-off and landing and obtain ATC clearance.