A0590/25
Checking status...
Taxiway Operations

Taxiway closure due to work in progress affecting TWY T and TWY L.

2025-02-28 18:00 - 2025-03-28 22:00

Period of Applicability

2025-02-28 18:00 - 2025-03-28 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiways T and L at WSSS are closed due to work in progress. TWY T is closed between TWY U8 and TWY U13, including the junction of TWY T and TWY U13 as well as all junctions within. TWY L is closed between TWY C14 and TWY C12, including the junctions of TWY L with TWY C14, TWY C13, and TWY C12. This closure is applicable on February 28 from 1800 to 2200 and on March 04, 07, 11, 14, 18, 21, 25, and 28 during the same time period.

Message

FLW TWY CLSD DUE WIP: I. TWY T BTN TWY U8 AND TWY U13, INCLUDING JUNCTION OF TWY T/TWY U13 AND ALL THE JUNCTIONS WITHIN II. TWY L BTN TWY C14 AND TWY C12 INCLUDING JUNCTIONS OF TWY L/TWY C14, TWY L/TW...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0590/25 NOTAMN
Q) WSJC/QMXLC/IV/BO/A/000/999/0122N10359E005
A) WSSS B) 2502281800 C) 2503282200
D) FEB 28 1800-2200, MAR 04 07 11 14 18 21 25 28 1800-2200
E) FLW TWY CLSD DUE WIP:
I. TWY T BTN TWY U8 AND TWY U13, INCLUDING JUNCTION OF TWY T/TWY
U13 AND ALL THE JUNCTIONS WITHIN
II. TWY L BTN TWY C14 AND TWY C12 INCLUDING JUNCTIONS OF TWY L/TWY
C14, TWY L/TWY C13 AND TWY L/TWY C12
Issued at: 2025-02-17 15:27
Was this helpful?