A0591/25
Checking status...
Taxiway Operations

Taxiways C and D closures due to work in progress.

2025-02-28 18:00 - 2025-03-28 22:00

Period of Applicability

2025-02-28 18:00 - 2025-03-28 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway C is closed between Taxiways C2 and K, including the junction of Taxiways C and C1. Additionally, Taxiway D is closed between Taxiways D14 and D1, including the junctions of Taxiways D and D1, D and D14, and all the junctions within the mentioned sections. This is due to work in progress. Closures are effective on February 28 from 1800 to 2200, and on March 4, 7, 11, 14, 18, 21, 25, and 28 during the same time window (1800 to 2200).

Message

FLW TWY CLSD DUE WIP: I. TWY C BTN TWY C2 AND TWY K INCLUDING JUNCTION OF TWY C/TWY C1 II. TWY D BTN TWY D14 AND TWY D1, INCLUDING JUNCTIONS OF TWY D/TWY D1, TWY D/TWY D14, AND ALL THE JUNCTIONS WITHI...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0591/25 NOTAMN
Q) WSJC/QMXLC/IV/BO/A/000/999/0122N10359E005
A) WSSS B) 2502281800 C) 2503282200
D) FEB 28 1800-2200, MAR 04 07 11 14 18 21 25 28 1800-2200
E) FLW TWY CLSD DUE WIP:
I. TWY C BTN TWY C2 AND TWY K INCLUDING JUNCTION OF TWY C/TWY C1
II. TWY D BTN TWY D14 AND TWY D1, INCLUDING JUNCTIONS OF TWY D/TWY
D1, TWY D/TWY D14, AND ALL THE JUNCTIONS WITHIN
Issued at: 2025-02-17 15:28