J1218/25
Checking status...
Taxiway Operations

Closure of taxiways M1, M2 and the section between M3 and M1.

2025-03-26 21:00 - 2025-03-28 07:00

Period of Applicability

2025-03-26 21:00 - 2025-03-28 07:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiways M1, M2 and the section between M3 and M1 are closed daily from 2100 to 0700, with a 15-minute prior notice for exceptions.

Message

TWY M1, TWY M2 AND TWY M BTN TWY M3 AND TWY M1 CLSD EXC WITH 15MIN PN CTC AD OPR TEL: 07 3406 3072

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J1218/25 NOTAMN
Q) YBBB/QMXLC/IV/BO/A/000/999/2723S15307E005
A) YBBN
B) 2503262100 C) 2503280700
D) DAILY 2100-0700
E) TWY M1, TWY M2 AND TWY M BTN TWY M3 AND TWY M1 CLSD
EXC WITH 15MIN PN 
CTC AD OPR TEL: 07 3406 3072
Issued at: 2025-03-10 01:45
Was this helpful?