J4309/25
Checking status...
Taxiway Operations

Taxiway G2 and a section of taxiway G between G2 and G3 are closed.

2025-09-11 07:07 - 2025-09-18 07:00

Period of Applicability

2025-09-11 07:07 - 2025-09-18 07:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway G2 is closed. In addition, the portion of taxiway G between taxiways G2 and G3 is closed. No times or dates were specified in the NOTAM.

Message

TWY G2 CLOSED TWY G BTN TWY G2 AND TWY G3 CLOSED

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J4309/25 NOTAMR J4260/25
Q) YBBB/QMXLC/IV/BO/A/000/999/1653S14545E005
A) YBCS
B) 2509110707 C) 2509180700 EST
E) TWY G2 CLOSED
TWY G BTN TWY G2 AND TWY G3 CLOSED
Issued 2 days ago
Was this helpful?