Multi-rotor operations below 7kg will occur in specified airspace.
2025-03-07 00:14 - 2025-06-04 13:29
Period of Applicability
2025-03-07 00:14 - 2025-06-04 13:29
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Multi-rotor operations below 7kg will take place within 200 meters either side of a line between specified coordinates, affecting airspace in the vicinity.
Message
UA OPS (MULTI-ROTOR BELOW 7KG) WILL TAKE PLACE OPR WI 200M EITHER SIDE OF A LINE BTN PSN: 345350.8S 1382914.2E BRG 314 MAG 3.6NM FM ARP AND 345510.4S 1382935.4E BRG 300 MAG 2.5NM FM ARP OPR WIL MNT TW...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-03-07 00:14
Was this helpful?