Multi-rotor operations below 2kg will take place in specified areas.
2024-09-24 05:42 - 2024-12-15 13:29
Period of Applicability
2024-09-24 05:42 - 2024-12-15 13:29
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Multi-rotor operations below 2kg will occur within 200 meters either side of a line between the specified positions. Timing information indicates that these operations will take place for half a day, from 'HJ'.
Message
UA OPS (MULTI-ROTOR BELOW 2KG) WILL TAKE PLACE OPR WI 200M EITHER SIDE OF A LINE BTN PSN: 345611.3S 1382953.8E BRG 278 MAG 1.78NM FM ARP AND 345729.7S 1383020.6E BRG 231 MAG 1.56NM FM ARP OPR WIL MNT ...
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors