F3338/25
Checking status...
UAS/Drone Operations

Multi-rotor unmanned aircraft operations will take place along a defined line near the aerodrome, with pilot/ATC contact required.

2025-08-29 00:26 - 2025-11-26 13:30

Period of Applicability

2025-08-29 00:26 - 2025-11-26 13:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Multi-rotor unmanned aircraft (below 7 kg) operations will take place within 200 m either side of a line between 34°53'50.8"S 138°29'14.2"E (bearing 314°M, 3.6 NM from ARP) and 34°55'10.4"S 138°29'35.4"E (bearing 300°M, 2.5 NM from ARP); contact tower on 120.5 MHz and operator telephone 0400 041 093. Schedule: HJ.

Message

UA OPS (MULTI-ROTOR BELOW 7KG) WILL TAKE PLACE OPR WI 200M EITHER SIDE OF A LINE BTN PSN: 345350.8S 1382914.2E BRG 314 MAG 3.6NM FM ARP AND 345510.4S 1382935.4E BRG 300 MAG 2.5NM FM ARP OPR WIL MNT TWR FREQ 120.5 OPR CTC TEL: 0400 041 093

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F3338/25 NOTAMR F2223/25
Q) YMMM/QWULW/IV/BO/AW/000/001/3457S13832E005
A) YPAD
B) 2508290026 C) 2511261330
D) HJ
E) UA OPS (MULTI-ROTOR BELOW 7KG) WILL TAKE PLACE
OPR WI 200M EITHER SIDE OF A LINE BTN PSN:
345350.8S 1382914.2E BRG 314 MAG 3.6NM FM ARP AND
345510.4S 1382935.4E BRG 300 MAG 2.5NM FM ARP
OPR WIL MNT TWR FREQ 120.5
OPR CTC TEL: 0400 041 093
F) SFC G) 141FT AGL
Issued 21 days ago
Was this helpful?