E2935/26
Checking status...
ADOther

Work is in progress adjacent to Runways 18R/36L, 18L/36R, and 01/19, with construction vehicles crossing.

2026-08-14 07:55 - 2026-12-31 15:59
Duration:LONG5 months

Period of Applicability

2026-08-14 07:55 - 2026-12-31 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress at nine areas located approximately 100–125 m west of the Runway 18R/36L and Runway 18L/36R centerlines and 108–120 m east of the Runway 01/19 centerline, at the specified distances north or south of the runway thresholds. Exercise caution due to vehicles crossing during construction.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

E2935/26 NOTAMR E1474/26
Q)ZBPE/QFAHW/IV/NBO/A/000/999/4004N11636E005
A)ZBAA B)2608140755 C)2612311559
E) WIP WI FLW AREA:
1. 100M-120M WEST OF RWY18R/36L CL,320M-365M NORTH OF RWY36L THR.
2. 100M-120M WEST OF RWY18R/36L CL,1,630M-1,665M SOUTH OF RWY18R
THR.
3. 100M-120M WEST OF RWY18R/36L CL,325M-350M SOUTH OF RWY18R THR.
4. 110M-125M WEST OF RWY18L/36R CL,320M-360M NORTH OF RWY36R THR.
5. 105M-120M WEST OF RWY18L/36R CL,1,800M-1,830M SOUTH OF RWY18L
THR.
6. 105M-125M WEST OF RWY18L/36R CL,305M-330M SOUTH OF RWY18L THR.
7. 108M-120M EAST OF RWY01/19 CL,325M-370M NORTH OF RWY01 THR.
8. 108M-120M EAST OF RWY01/19 CL,1,765M-1,810M SOUTH OF RWY19 THR.
9. 108M-120M EAST OF RWY01/19 CL,300M-345M SOUTH OF RWY19 THR.
EXERCISE CAUTION WITH THE CROSSING VEHICLES DURING THE
CONSTRUCTION PERIOD.
Was this helpful?