G2374/26
Checking status...
OBSConstruction Activity

New wind turbine obstacles have been erected.

2026-06-15 08:48 - 2026-07-08 15:59
Duration:24 days

Period of Applicability

2026-06-15 08:48 - 2026-07-08 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

New wind turbine obstacles have been erected with the specified positions and elevations.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

(G2374/26 NOTAMR G1447/26  Q)ZGZU/QOBCE/IV/M/A/000/999/2458N10953E005  A)ZGKL B)2606150848 C)2607081559  E) NEW OBSTS ERECTED WITH DETAILS AS FOLLOWS, ALL THE DATA BASED  ON ARP:   OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M))   ELEVATION/(HEIGHT)(M) MARKING/LIGHTING TYPE AND COLOUR FLIGHT  PROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS  01WIND TURBINES WIND TURBINES 48/50,180 854  - -  02WIND TURBINES WIND TURBINES 49/50,280 784  - -  03WIND TURBINES WIND TURBINES 46/50,070 874  - -  04WIND TURBINES WIND TURBINES 46/50,240 894  - -  05WIND TURBINES WIND TURBINES 46/50,590 892  - -  06WIND TURBINES WIND TURBINES 46/50,500 884  - -  07WIND TURBINES WIND TURBINES 46/50,700 892  - -  08WIND TURBINES WIND TURBINES 47/51,240 1,006  - -  09WIND TURBINES WIND TURBINES 47/51,460 919  - -  10WIND TURBINES WIND TURBINES 47/51,500 866  -   )  // // -  11WIND TURBINES WIND TURBINES 47/50,690 976  - -  12WIND TURBINES WIND TURBINES 47/50,550 980  - -  13WIND TURBINES WIND TURBINES 48/50,440 1,001  - -  14WIND TURBINES WIND TURBINES 48/50,290 979  - -  15WIND TURBINES WIND TURBINES 48/50,160 956  - -  16WIND TURBINES WIND TURBINES 48/50,040 923  - -   )  // //
Was this helpful?