Due to an obstacle, database coding table ZGSZ-0C-15 for the ZGSZ-5L-9 RNP ILS/DME Z RWY34L procedure is amended. The RWY34L approach transition via SZ051 is coded as IF SZ051 at 1,500 m and maximum 205 kt, followed by TF SZ055 at 900 m, TF SZ053 at 750 m, and TF CF34L at 700 m, using RNP 1.