Period of Applicability
2026-03-27 03:14 - 2026-06-30 15:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
The aerodrome is conducting a takeoff automatic leave-frequency test: tower will include the first post‑takeoff contact frequency in the takeoff clearance, and aircraft must switch to that specified frequency after liftoff without further tower instruction; when changing frequency, pilots must ensure the aircraft is at or above the stated minimum altitude applicable to day or night operations.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?