G0846/25
Checking status...
Approach Procedures

The SID procedure for runway 26 has been adjusted for departing aircraft.

2025-03-19 03:03 - 2025-05-14 15:59

Period of Applicability

2025-03-19 03:03 - 2025-05-14 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The SID procedure for runway 26 has been adjusted to require departing aircraft to climb with a gradient of not less than 5.1 percent to 300 meters after take-off, as referenced in the AIP.

Message

RWY26 SID PROCEDURE ADJUSTED AS FLW: REF AIP CHINA ZJSY AD2.24-7B AND 2.24-7D, DEPARTING ACFT SHALL CLIMB WITH GRADIENT NOT LESS THAN 5.1 PERCENT TO 300M AFTER TAKE-OFF.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0846/25 NOTAMR G4510/24
Q) ZJSA/QPDCH/I/NBO/A/000/999/1818N10925E005
A) ZJSY B) 2503190303 C) 2505141559 
E) RWY26 SID PROCEDURE ADJUSTED AS FLW:
REF AIP CHINA ZJSY AD2.24-7B AND 2.24-7D, DEPARTING ACFT SHALL 
CLIMB WITH GRADIENT NOT LESS THAN 5.1 PERCENT TO 300M AFTER 
TAKE-OFF.
Issued at: 2025-03-19 03:25
Was this helpful?