L0213/25
Checking status...
Runway Operations

Segregated parallel operations on trial at ZLLL.

2025-03-19 16:00 - 2025-06-19 15:59

Period of Applicability

2025-03-19 16:00 - 2025-06-19 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Segregated parallel operations are being conducted on a trial basis. For southbound operations, either RWY19 for arrival and RWY18L for departure or vice versa can be used. For northbound operations, RWY01 is designated for arrival and RWY36R for departure.

Message

SEGREGATED PARALLEL OPERATIONS ON TRIAL,DETAIL AS FLW: 1. WHEN OPERATING TO THE SOUTH: RWY19 FOR ARRIVAL,RWY18L FOR DEPARTURE, OR RWY18L FOR ARRIVAL,RWY19 FOR DEPARTURE. 2. WHEN OPERATING TO THE NORT...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

L0213/25 NOTAMN
Q) ZLHW/QXXXX/IV/NBO/AE/000/999/3631N10337E005
A) ZLLL B) 2503191600 C) 2506191559 
E) SEGREGATED PARALLEL OPERATIONS ON TRIAL,DETAIL AS FLW:
1. WHEN OPERATING TO THE SOUTH: RWY19 FOR ARRIVAL,RWY18L FOR 
DEPARTURE,
OR RWY18L FOR ARRIVAL,RWY19 FOR DEPARTURE.
2. WHEN OPERATING TO THE NORTH:RWY01 FOR ARRIVAL,RWY36R FOR 
DEPARTURE.
Issued at: 2025-03-19 11:40
Was this helpful?