Trial lighting is being tested in the taxiway area and new runway south of runway 05R/23L.
2025-04-30 01:00 - 2025-05-10 09:00
Period of Applicability
2025-04-30 01:00 - 2025-05-10 09:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Trial lighting is being tested in the taxiway area and new runway located south of runway 05R/23L, affecting a specific area from 100 meters west of runway 05R threshold to 4,670 meters east of the same threshold, and 342.5 meters to 417.5 meters south of runway 05R/23L centerline. The testing is scheduled daily from 0100 to 0900.
Message
LIGHTS ON TRIAL OF TWY AREA AND NEW RWY SOUTH OF RWY05R/23L: 1. 100M WEST OF RWY05R THR - 4,670M EAST OF RWY05R THR,342.5M - 417.5M SOUTH OF RWY05R/23L CL. 2. 519.5M - 3,920M EAST OF RWY05R THR,37.5M...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-28 07:47
Was this helpful?