F3458/26
EST
Checking status...
NavDeparture Procedures

The PONAB-HSN SID segment requires radar vectoring and caution.

2026-09-02 16:00 - 2026-12-31 15:59
Duration:LONG4 months EST

Period of Applicability

2026-09-02 16:00 - 2026-12-31 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For the PONAB-HSN segment referenced on AIP charts ZSPD-3V-3 HSN-E and HSN-F, and ZSPD-3V-6 HSN-J and HSN-K, aircraft must follow radar vectoring and flight crews must exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F3458/26 NOTAMN
Q)ZSHA/QPDXX/I/NBO/A/000/999/3109N12148E005
A)ZSPD B)2609021600 C)2612311559 EST
E) REF AIP ZSPD-3V-3 HSN-E,HSN-F :SEGMENT PONAB-HSN
REF AIP ZSPD-3V-6 HSN-J,HSN-K :SEGMENT PONAB-HSN
ACFT SHALL FOLLOW RADAR VECTORING.FLIGHT CREW SHALL EXERCISE
CAUTION.
Was this helpful?