F2391/26
EST
Checking status...
OpsFlight Procedures

Trial of the LID landing information delivery procedure for arrivals to ZSSS.

2026-06-18 06:33 - 2026-12-31 15:59
Duration:VERY LONG7 months EST

Period of Applicability

2026-06-18 06:33 - 2026-12-31 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Implement a trial of the LID (Landing Information Deliver) operation for arrivals to ZSSS. Shanghai Approach will issue LID messages by data link about 50 minutes before landing, including the expected arrival procedure, approach method, landing runway, and parking stand. Pilots may use the LID information for FMS preparation without radio confirmation, but on initial contact they should report the received LID information. After establishing radio communication, pilots must follow controller instructions for any changes. If LID information is not received, pilots should follow the current procedure.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

(F2391/26 NOTAMR F8592/25  Q)ZSHA/QXXXX/IV/NBO/AE/000/999/3112N12120E005  A)ZSSS B)2606180633 C)2612311559 EST  E) IMPLEMENT THE LID(LANDING INFORMATION DELIVER) OPERATION  TRIAL.THE BASIC LID PROCEDURE AS FOLLOW:  1.SHANGHAI APPROACH WILL ISSUE THE LID MESSAGE BY DATA-LINK TO  ARRIVAL FLIGHTS TO ZSSS 50 MINUTES BEFORE LANDING;  2.THE LID INFORMATION WILL INCLUDE EXPECTED ARRIVAL PROCEDURE,  APPROACH METHOD, LANDING RUNWAY, AND PARKING STAND;  3.PILOT CAN DIRECTLY USE THE LID INFORMATION FOR FMS PREPARATION  DURING CRUISE PHASE WITHOUT RADIO CONFIRMATION BY ACC;  4.ON INITIAL CONTACT SHANGHAI APPROACH,PILOT SHOULD ADVISE YOUR  LID INFORMATION AT LEAST INCLUDING EXPECTED ARRIVAL PROCEDURE,  APPROACH METHOD, AND LANDING RUNWAY;  5.SHANGHAI APPROACH WILL CONFIRM OR MODIFY FROM PILOT LID REPORT:  6.AFTER ESTABLISH RADIO COMMUNICATION WITH SHANGHAI APPROACH, ALL  THE LANDING INFORMATION SHOULD BE JUST FOLLOWED THE INSTRUCTION BY  CONTROLLER FOR ANY POSSIBLE CHANGE;  7.IF PILOT DO NOT RECEIVE THE LID INFORMATION, PILOT SHOULD FOLLOW  THE CURRENT PROCEDURE;  8.FOR BETTER IMPROVE THE   )  // // LID SERVICE, PLEASE FEEL FREE TO TELL US YOUR SUGGESTION AND  COMMENTS TO EMAIL:  SUNY1(A)ATMB.NET.CN     )  // //
Was this helpful?