Period of Applicability
2025-06-30 16:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Shanghai Hongqiao International Airport visual approach regular operation is implemented when prevailing visibility is greater than 5 kilometres and the ceiling is 700 metres or above. Visual approach may be applied by the pilot or ATC after mutual approval, and ATC may issue visual approach clearance after the pilot reports the runway or preceding aircraft in sight. After clearance, the pilot controls altitude and heading and remains responsible for safe separation from ground obstacles and other aircraft. ATIS will broadcast information on multi-runway visual approaches. Controllers will terminate the visual approach if the pilot cannot continue due to weather or other reasons, if weather falls below visual approach conditions, or if a situation affecting flight safety is discovered. If the aircraft cannot complete the visual approach, it will be converted to an instrument approach or terminated, with ATC providing necessary assistance and separation.