U3422/26
Checking status...
OBSCrane Operations

New crane obstacles are erected within 15 km of runway 02L/20R.

2026-07-18 16:00 - 2027-01-18 15:59
Duration:VERY LONG7 months

Period of Applicability

2026-07-18 16:00 - 2027-01-18 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

New cranes are erected within a circle radius of 15 km centered on the center of runway 02L/20R. The listed crane obstacles are numbered 1 to 5 with the specified bearings, distances, elevations, and lighting.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

U3422/26 NOTAMN
Q)ZPKM/QOBCE/IV/M/A/000/999/3035N10357E005
A)ZUUU B)2607181600 C)2701181559
E) ADD NEW OBSTACLES WITHIN A CIRCLE WITH A RADIUS OF 15KM
(CENTERED ON THE CENTER OF RWY02L/20R):
OBSTACLE ID/DESIGNATION     TYPE     POSITION MAG
BRG(DEGREE)/DIST(M) ELEVATION(M)
OBSTACLE MARKING/LIGHTING TYPE& COLOUR
NR.1 CRANE    CRANE  351/4253.0     544.9      LGT
NR.2 CRANE    CRANE  352/4275.0     547.9      LGT
NR.3 CRANE    CRANE  351/4361.0     555.4      LGT
NR.4 CRANE    CRANE  352/4163.0     550.4      LGT
NR.5 CRANE    CRANE  350/4150.0     547.4      LGT
Was this helpful?